Deer Ridge Barrier Wall (St. Albert)
Owner
City of St. Albert
Contract Date:
November, 2018
Description:
Truck-mounted mobile LiDAR was contracted to survey the noise barrier wall along St. Albert Trail bordering the Deer Ridge neighbourhood. This is used to determine the location of the wall alongside the roadway and quantifies existing conditions along the wall and its surrounding area.